Pre Construction 7/31
MOn
TIM Priority
Sankoski B.Permit
Powell B.Permit
BUtler Sign off
Smith Sign oFfs (waiting on client)
Tim To check on Friedman
SHORE - Chris to Order extra trims & Fibo
SHORE - Order retest Blower door
Concord - Met with excavator, waiting on trim
Powell - BUIlding Permit by 9/1
Powell - Kevin needs to get Electrical going
Sankowski - B PErmit electrical and stamped site plan (just need to pay surveyor)
**tim tio ask BUlding department to issue permit and do electrical later
**Tim to send Concord exvator scop packet and see if they'll do the work
Smith
*Tim to sign off on finals (waiting on Customer for electrical diagram)
BUtler
**waiting on PERC test and septic test
**Sign of
Mcquire - Tim To send touch email saying waiting on final shake for factory pricing
Gang - Tim to introduce Chris for
Shin - Tim to update tickets for updated pricing
Geason - no action
JEFF
- FUller: daily updates
**need siding material cost for C/O
LU-
Jeff to meet on site this week to go over C/o items (bioswale, sump location)
*Sump in utility to cost roughly 1k more. Excat amount to be determined on install